Into the 20th Century!!! An asbestos removal specialist removed the asbestos covered ducts. Scott, Greg & Nathan removed the huge furnace piece by piece. Then the new went in! All new ducts were run connecting to existing old floor registers. A new return drop was made & installed. A chimney liner was installed to protect the chimney from the cool flue gases of the 80% furnace.
The final product: An American-Standard Freedom 80 2 stage gas furnace; WeatherKing cooling system with Copeland Scroll compressor & Multiflex indoor coil; General 1042 humidifier; Maple Chase 2 stage programmable thermostat. What a system!